TYPE Fast Motor Yacht
FLAG Cayman Islands
CLASSIFICATION Built to RINA
DIMENSIONS Length O.A. 22.00 m (170’6”)
Beam 5.60 m (18’4”)
Draft 1.30 m (4’3”)
DISPLACEMENT 42 tons
YEAR BUILT 2004
BUILDER Overmarine, Italy
CONSTRUCTION Hull: GRP
Superstructure: GRP
Deck: Teak
MAIN MACHINERY
MAIN ENGINES 2 x 1,550 hp MAN Diesel Engine, 1156 Kw (New in 2015)
ENGINES HOURS January 2017
Port: 100 hrs.
Starboard 100 hrs.
PROPULSION Arneson Drives
SPEED & CONSUMPTION Max 40 knots
Cruising 33 knots
Economical 31 knots for 275 nm — 350 litres / hr
AUXILIARY MACHINERY / EQUIPMENT & ELECTRICAL SYSTEM
GENERATORS 2 x Kohler 20 Kw (new in 2015)
GENERATOR HOURS TBC
SHORE POWER CONVERTER Atlas (New in 2016)
WATERMAKERS Idromar
AIR CONDITIONING Yes
BOW THRUSTER Yes
CAPACITIES (approximate)
FUEL 4,200 litres / 1,109 US gallons
WATER 900 litres / 237 US gallons
GREY WATER 330 litres / 87 US gallons
BLACK WATER 500 litres / 132 US gallons
NAVIGATION & COMMUNICATION EQUIPMENT
AUTOMATIC PILOT Furuno
RADAR Furuno 48 miles
CHART PLOTTER 2 x Furuno GD 1900
GPS Geonav 5C
VHF RADIO Furuno with DSG
OTHER Depth Sounder
AUDIO / VISUAL ENTERTAINMENT SYSTEMS
TVs in the cockpit, main saloon and in all cabins.
DOMESTIC EQUIPMENT
Brand new equipment (2015)
Fridge and freezer
Oven Microwave
Hotplate Miele
Washing machine and dishwasher
2 fridges on the main deck
Ice maker
TENDERS & WATERSPORTS EQUIPMENT
TBC
ACCOMODATION
OWNER: Master cabin forward on the lower deck with separated bathroom and toilette.
GUESTS: 1 x double cabin and 1 x twin with pullman bed. These two cabins have ensuite facilities.
CREW: Up to 2 crew in one cabin located at the bow
COMMENTS
2015 Large refit project in 2015 including:
2 x New MAN 1550 Hp engines
2 x New generators Kohler 20 Kw
All Batteries
Pumps including water
Air conditioning system
Galley equipment
Full inspection of the propulsion system (Arneson)
Hull and structure polish,
Varnish of all woods
Repaint of the rear transom, garage door and mast
2016 Installation of a brand new Atlas shore power converter
New galley equipment
Renewal of some of the navigational equipment
Replacement of the main computer cards